By ERA Robotics · · Reporting period: 3 February–14 November 2026

The operational need
Hospital cleaning teams manage routine floors alongside detail cleaning, touchpoints and unexpected needs. This deployment illustrates repeatable floor scrubbing as a supporting task—not a replacement for the wider cleaning service.
ERA identifies the deployed robot as PUDU CC1 Pro. The supplied report export labels the model “PUDU CC1”; ERA’s site brief and subsequent confirmation identify it as CC1 Pro. The hospital name and location are not disclosed.
What the deployment recorded
- Cumulative scrubbing coverage
- 230,301 m²
- Recorded robot run time
- 392.7 h
- Scrubbing tasks
- 571
- Active cleaning days
- 193
The recorded activity averages approximately 1,193 m² per active day and 586 m² per robot run hour. These are rounded ratios from this report, not rated productivity or guaranteed results.
Figures are reported by ERA, not independently audited. Coverage is cumulative across repeated tasks, not the hospital’s floor area. Robot run hours do not establish staff hours saved, cash savings, payback or infection-control outcomes.
People make robots work
ERA’s original update highlights site setup, staff training and ongoing support. A practical deployment needs clear cleaning zones, operating responsibilities, routine maintenance and a way to review completed work. People remain responsible for the cleaning standard and for tasks beyond the robot’s scope.
Read about ERA’s deployment, training and support. For healthcare sites, floor finish, traffic, access and infection-control policies must be reviewed before a robot is approved.
Applying the lessons to your facility
Establish the cleanable area, required frequency and current workload, then assess coverage, interventions, supervision and cleaning quality during a trial. Compare the commercial cleaning robot range against the work—not just the headline figures.
The ROI calculator can explore your own assumptions; released staff capacity and actual cash savings must remain separate.
Sources: ERA’s CC1 Pro hospital LinkedIn post and the supplied hospital case study PDF.
Recommendations are subject to site assessment and approval.
Book a Site Assessment